The third Vico Office release connects the 3D model geometry to 4D planning and scheduling to 5D cost planning and budgeting. Creating a live, integrated model means that a change in the building design immediately results in a change in the schedule and budget. 5D BIM is now a complete answer machine for integrated building teams. Users will recognize the same GUI and features ribbon, as well as the step-by-step navigation on the left-hand side of the screen, but now with expanded capabilities for LBS Manager, Schedule Planner, 4D Manager, and Production Controller.